Inside a SAFE dormitory room — 8 bunk beds, climate controlled
SAFE managed dormitory building exterior, G+4 facility
Aerial view of SPR City township surrounding the SAFE facility
SAFE
SPR India · Industrial Housing

Inside a SAFE room

8 beds. 50 sq.ft per person. Built to feel like home.

Climate-controlled, gender-secure, IGBC-certified rooms — 4 km from the gate.

Zooming out — the facility

A full G+4 managed campus, walking distance from your plant.

Security, housekeeping, dining, healthcare and recreation — all under one roof.

Zooming out — the township

Part of SPR City — Chennai's largest integrated development.

Mall, hospital, schools, retail and 7M+ sq.ft of residential development around it.

Scroll to zoom out

⚠ The problem

Your workers spend 3–4 hours daily commuting — before they even clock in.

Every single day. Here is what their morning — and the rest of their shift — actually looks like:

4:30 AM

Wakes up

Shared room, 8–15 people

5:30 AM

Bus departs

If on time. Often it isn't.

7:00 AM

Arrives exhausted

Before shift even starts.

3:30 PM

Shift ends

Waits 30–60 min for bus home

5:30 PM

Back home

13 hrs gone. Repeats tomorrow.

This is not just a welfare concern — it is costing your business ₹5–8 Cr per year.

₹1,500–2,800

per worker · per month

Transport cost — paid directly or hidden inside contractor markup.

500 workers = ₹3.6 Cr/year minimum

25–30%

annual attrition

Contract workers leave — mostly because of unstable housing, not pay.

₹20,000 per replacement. Every year.

No bus

after 10 PM in Chakan

Night shift chronically under-staffed. Workers ride motorcycles in the dark.

One incident. Who is responsible?

The cost that never appears on any P&L — but you feel it every single day: phantom billing (est. 15%) · productivity loss · new joiner dropout · night shift OT · admin time on transport. Together: ₹5–8 Cr/year for a 500-worker plant.

✓ The solution

What if your workers lived 4 km from your gate? Walked to work. On time. Every shift.

SAFE Accommodation builds managed dormitories next to your plant. Workers stop commuting. You stop paying for it.

✕ Today

  • 25–40 km commute. 60+ buses. 3 shifts. Constant logistics headache.
  • ₹1,500–2,800/worker/month. Growing every year. Phantom billing on top.
  • Workers arrive fatigued. Night shift unreliable. Absenteeism high.
  • 25–30% annual attrition. Same recruitment cost. Every single year.
  • Phantom billing & contractor disputes. Unauditable. Invisible drain.

✓ With SAFE

  • Walk 10 min to work. 3 last-mile shuttles replace 60 buses.
  • One fixed invoice. ₹2,800–3,200/bed/month. Fully auditable. No surprises.
  • Night shift 100% staffed. Workers live 5 minutes from the gate.
  • Attrition drops to 10–15%. Workers stay for the room and the job.
  • ESG audit ready Day 1. IGBC certified. Apple Manual 4.7 compliant.

Women's safety — a non-negotiable SAFE standard

Fully separate female block8-ft perimeter wall + barbed wireFemale wardens only · 24×7Apple Manual 4.7 compliantNo shared access at any point

How it works — 5 simple steps

1

You commit to beds

MoU + 3-yr lock-in

2

We build near your plant

18–24 months

3

Workers move in

Room ready Day 1

4

You pay per bed

Fixed. Transparent.

5

Savings hit your P&L

Transport ↓ Attrition ↓

What every SAFE facility includes

Site Adjacent

3–8 km from your gate. Walk or 10-min shuttle.

Multi-Tenant

Multiple companies. Dedicated floors per company.

Fully Managed

Security, housekeeping, maintenance — all SAFE's.

Gender Secure

Male & female blocks 100% physically separate.

Fully Compliant

Fire NOC, Dorm Reg, FSSAI, Struct. Cert — all done.

IGBC Certified

Solar panels, STP, green building standard.

Fixed per-bed pricing. No phantom billing. No contractor disputes — ever.

↗ Live proof — Tamil Nadu

Not a concept. Already running with 8 companies.

SPR City Estates, Sriperumbudur — operational today.

0+

Beds operational

0

Companies live today

0

Projects completed

0K

Beds identified across India

0M

Projected savings / year

SALCOMP facility — building exterior with landscaped lawn
SALCOMP facility — G+4 dormitory block, actual site
SALCOMP facility — internal corridor and elevator lobby
SPD facility — completed dormitory tower with colour-coded blocks

Companies working with SAFE in Tamil Nadu

India Yamaha MotorFoxconnTVS DelphiAxles IndiaWheels IndiaLuxshareMando AutomotiveHonhaiIndia Yamaha MotorFoxconnTVS DelphiAxles IndiaWheels IndiaLuxshareMando AutomotiveHonhai

Govt. of India · 2022

Fastest Mover in Industrial Housing

Awarded by Hon'ble Shri Hardeep Singh Puri, Union Minister, Ministry of Housing & Urban Affairs, Government of India. Recognised as India's first private operator of integrated industrial dormitories at scale. Projects visited by industrial and urban development authorities from 5+ states as a model to replicate.

Fastest Mover — Govt. of India 2022IGBC Green BuildingPMAY-ARHC BenchmarkNITI Aayog FeaturedUnion Budget 2024 Referenced

↗ Now expanding — Chakan, Pune

Coming to Chakan, Pune. India's Motor City has zero organised worker housing.

SAFE Accommodation is building it. First movers get the best location and the lowest price.

5.5×

Return on SAFE invest

Month 3

Pays back fully

80%

Transport cost cut

What SAFE saves a plant with 500 contract migrant workers (350 beds, anchor rate)

Current annual burden

  • Transport — 15 buses × ₹2L × 12₹3.60 Cr
  • Phantom billing (est. 15%)₹54 L
  • Attrition — 125 replacements × ₹20K₹25 L
  • Night shift gap + OT cost₹36 L
  • Productivity loss (1 hr/day × 500)₹1.56 Cr
  • Admin time on transport mgmt₹24 L
Total dead-weight cost₹6.59 Cr

With SAFE — net savings

  • SAFE invoice (350 × ₹3,000/mo)₹1.26 Cr cost
  • Worker co-pay (350 × ₹1,200/mo)₹50 L recovered
  • Net company SAFE cost₹0.87 Cr/yr
  • Total savings vs current₹4.68 Cr/yr
Net annual benefit₹3.81 Cr

Target companies — Chakan MIDC belt · 4 acres shortlisted in Nighoje / Kuruli

Bajaj Auto

~10,000 workers

4–5 km

Volkswagen

~9,000 workers

5–8 km

Mercedes-Benz

~7,000 workers

2–3 km

Mahindra & M

~7,000 workers

3–5 km

JCB India

~5,000 workers

12–15 km

Endurance

~2,500 workers

Chakan

Get started in 3 steps

Step 1

30-min conversation

Share transport & attrition data

Step 2

Receive custom ROI model

Your exact savings in writing

Step 3

Sign MoU & reserve beds

Lock anchor rate & best location

Get your free ROI model in 48 hours.

Tell us your worker count and transport bill. We calculate your exact annual savings — in writing, with your actual numbers. No commitment required.

SAFE

Site Adjacent Factory Employee Accommodation

A SPR India initiative — managed industrial dormitories built next to your plant. Already operational with 8 companies across Tamil Nadu, expanding to Chakan, Pune.

Founder & contact

Khush Pomani

Director, SPR India · Founder, SAFE Accommodation

+91 90040 46464 khushgpomani@gmail.com

Corporate office

SPR Construction Pvt. Ltd, No.1, Cooks Road,
B&C Mills, SPR City, Chennai – 600 012.

+91 81486 81486 marketing@sprindia.com

© 2026 SPR India · SAFE Accommodation. All rights reserved.

First mover gets the best location & lowest price. Every day of delay is a risk someone else moves first.